Interactive tool
BOT Total Cost Calculator
Model the total cost of a Build Operate Transfer engagement over 5 years. Compare against staff augmentation and onshore delivery. Results are delivered as a PDF report.
Step 1
Team Composition
Step 2
Engagement Parameters
Your Cost Comparison
BOT Model
€X.XM
Build + Operate + Direct
Staff Augmentation
€X.XM
Permanent provider margin
Onshore (HQ country)
€X.XM
Direct employment
BOT saves vs Onshore (HQ)
€X.XM
XX% less than onshore
Build
Mo 1–4
€XXK
Operate
Mo 5–36
€X.XM
Post-Transfer
Mo 37–48
€X.XM
Year-by-Year Comparison
Your report is ready
Complete the form below to download your full cost comparison as a PDF — with year-by-year breakdown, phase analysis, and all assumptions.
Download PDF report ↓Get your detailed PDF report
The report includes year-by-year cost breakdown, phase cost analysis, assumptions, and a Kernstein case study. Delivered to your inbox within minutes.